ABC NEWS NEPAL | No.1 News channel of Nepal
११ भदौ २०८३, बिहिबार
  • होमपेज
  • मुख्य समाचार
  • अर्थ वाणिज्य
  • विचार
  • खेलकुद
  • अन्तर्राष्ट्रिय
  • प्रदेश विशेष
  • राजनीति विशेष
  • ENGLISH
  • समाचार
  • विशेष
  • रिपोर्ट
  • विचार
  • अर्थ वाणिज्य
  • जीवनशैली
  • प्रदेश विशेष
  • मनोरञ्जन
  • खेलकुद
  • ENGLISH
  • प्रदेशबिशेष
    • कोशी
    • मधेश
    • बागमती
    • गण्डकी
    • वाग्मती
    • कर्णाली
    • सुदूरपश्चिम
  • सोसल भिडिया
  • Facebook
  • Twitter
  • Youtube
  • Instagram

Nepal Dispatches Solar Power Banks to Flood-Hit Regions


ABC NEWS
११ भदौ २०८३, बिहिबार   १२ : ३५   बजे

Kathmandu— The Ministry of Energy, Water Resources and Irrigation in Nepal is providing alternative power sources to areas affected by recent flooding in Rasuwa, Nuwakot, and Dhading. Extensive damage to electricity infrastructure, including the complete destruction of a key substation and disruption of transmission lines, has halted hydropower generation totaling 431.1 megawatts. The ministry plans to distribute 500 solar power banks through the National Disaster Risk Reduction and Management Authority to provide lighting and mobile phone charging capabilities in impacted communities.

Infrastructure Damage and Power Outages

Floods have caused significant damage to Nepal’s electricity infrastructure, impacting approximately 10 percent of the country's total generation capacity. The 220 kV Trishuli 3B Hub Substation was completely destroyed, and six transmission lines were disrupted. Twelve hydropower projects have been affected, leading to a halt in the production of 431.1 megawatts of electricity.

Emergency Power Distribution

In response to the widespread outages, the Ministry of Energy is coordinating with the Alternative Energy Promotion Centre to deliver 500 solar power banks to the flood-affected areas on Thursday. These units will be handed over to the National Disaster Risk Reduction and Management Authority, which is headed by the Prime Minister, for distribution to those in need.

Restoration Challenges

Immediate restoration of electricity in Rasuwa is not feasible due to the complete loss of a substation washed away by floodwaters. Sanjeev Maharjan, Chief Personal Secretary to Energy Minister Biraj Bhakta Shrestha, explained that “The substation in Rasuwa has been swept away, so electricity cannot be restored immediately.” The solar power banks are intended as an interim solution while long-term repairs are assessed and undertaken.

Minister Shrestha is scheduled to inspect the Load Dispatch Centre to further assess the impact of the floods on the national power supply system and monitor restoration efforts.

(With inputs from RN)

Originally published on abcnews.com.np.

प्रतिक्रिया दिनुहोस्

ताजा अपडेट

भोटेकोसी बाढीपछि ६४४ पर्यटक सम्पर्कविहीन, सबैभन्दा धेरै भारतीय नागरिक

सेनाद्वारा ३३६ जनाको हवाई उद्धार, ६ देशका ४५ जना विदेशी नागरिक

सम्बन्धित

Flash Flooding Causes Widespread Damage in Nepal’s Devighat

Nepal Intensifies Rescue Efforts After Deadly Bhotekoshi River Flash Flood

Nine Mahottari Residents Missing After Rasuwa Flash Flood

Nepal Authorities Seek Coordination of Helicopter Rescues After River Flash Flood

Escalating Conflicts Mirror Historical Patterns, Author Argues

OpenAI Detected Malicious AI Activity Months Before Hugging Face Hack

ABC NEWS NEPAL | No.1 News channel of Nepal
एबीसी मिडिया ग्रुप प्रा.लि.
  • सूचना विभागमा दर्ता नं. : २००१।०७७–०७८
  • कार्यालय सम्पर्क
  • Lazimpat, Ranibari- Kathmandu - 3
    +977 01 4240666 / 977-014011122
    Admin: [email protected]
    News: [email protected]
    विज्ञापनका लागि सम्पर्क
  • +977 9802082541, 9802060000
    [email protected]
साइट नेभिगेशन
  • गृहपृष्‍ठ
  • समाचार
  • विशेष
  • अन्तर्वार्ता
  • एबीसी विज
  • जीवनशैली
  • मनोरञ्जन
  • विचार
  • SS Opinion
एबीसी मिडिया ग्रुप प्रा.लि.टीम
  • अध्यक्ष / प्रधान सम्पादक : शुभशंकर कँडेल
  • प्रबन्ध निर्देशक : शारदा शर्मा
  • सम्पादक : डण्ड गुरुङ
  • सह-सम्पादक : कविराज बुढाक्षेत्री
©2026 ABC NEWS NEPAL | No.1 News channel of Nepal | Website by Appharu