ABC NEWS NEPAL | No.1 News channel of Nepal
९ भदौ २०८३, मंगलबार
  • होमपेज
  • मुख्य समाचार
  • अर्थ वाणिज्य
  • विचार
  • खेलकुद
  • अन्तर्राष्ट्रिय
  • प्रदेश विशेष
  • राजनीति विशेष
  • ENGLISH
  • समाचार
  • विशेष
  • रिपोर्ट
  • विचार
  • अर्थ वाणिज्य
  • जीवनशैली
  • प्रदेश विशेष
  • मनोरञ्जन
  • खेलकुद
  • ENGLISH
  • प्रदेशबिशेष
    • कोशी
    • मधेश
    • बागमती
    • गण्डकी
    • वाग्मती
    • कर्णाली
    • सुदूरपश्चिम
  • सोसल भिडिया
  • Facebook
  • Twitter
  • Youtube
  • Instagram

Landslides and Flooding Halt Traffic on Multiple Nepal Road Sections


ABC NEWS
९ भदौ २०८३, मंगलबार   ४ : ५५   बजे

Kathmandu— Recent heavy rains have caused widespread disruption to transportation networks in Nepal, with landslides, flooding, and debris blocking roads in eight districts as of 10:00 am today. Police report that road sections in Kavrepalanchok, Sindhuli, Makawanpur, Nuwakot, Ilam, Sindhupalchok, Rasuwa, and Rukum West are affected, prompting temporary or complete closures to ensure public safety.

BP Highway Restrictions

The BP Highway, a vital route through Kavrepalanchok and Sindhuli, has implemented restricted operating hours due to the risk of flooding. Vehicular movement is halted between 6:00 pm and 4:00 am daily, but allowed during daylight hours from 4:00 am to 6:00 pm.

Kanti Lokpath and Tokha-Chhahare Closures

Authorities have prohibited all vehicle traffic on the Kanti Lokpath in Makawanpur between 5:00 pm and 5:00 am. Similarly, the Tokha-Chhahare road section in Nuwakot is closed to all but essential service vehicles from 10:00 pm to 5:00 am.

Complete Road Blockages Reported

Several key routes are completely impassable due to landslides and river erosion. The Mechi Highway in Ilam Municipality-9 is blocked by muddy conditions, though an alternative route exists. A landslide on the Araniko Highway in Sindhupalchok, combined with debris from the Khahare River, has fully obstructed traffic since August 21. Further west, the Trishuli–Mailung–Syafrubesi road section in Rasuwa is blocked after erosion undermined the roadway. The Jajarkot-Dolpa route of the Bheri Corridor in Rukum West remains closed due to a debris flow.

Police Issue Travel Advisory

Nepal Police have issued an advisory urging caution for those traveling on affected roads, citing increasing risks due to ongoing rainfall and potential further disruptions. Authorities are monitoring conditions closely and working to clear obstructions where possible.

The situation remains fluid as rains continue, and authorities will likely provide updates on road openings and closures as conditions change.

(With inputs from RN)

Originally published on abcnews.com.np.

प्रतिक्रिया दिनुहोस्

ताजा अपडेट

कांग्रेसको १५औँ महाधिवेशन रोक्न देउवा र खड्का सर्वोच्चमा

फोहोर व्यवस्थापनबारे प्रधानमन्त्रीसँग छलफल गर्ने मेयर्स फोरमको निर्णय

सम्बन्धित

Norway Prioritizes Arctic Oil and Gas Development Despite EU Climate Concerns

Cricket Legends Appeal for Medical Care of Former Pakistani Prime Minister Imran Khan

UN Watchdog Urges India to Address Discrimination Against Minorities

AIPAC’s Influence Wanes as US Politicians Distance Themselves From Pro-Israel Lobby

Russia Dismisses German Complaint Over Missile Strike Near Kyiv

Karnali Province Launches Fruit Farming Initiative Across Multiple Districts

ABC NEWS NEPAL | No.1 News channel of Nepal
एबीसी मिडिया ग्रुप प्रा.लि.
  • सूचना विभागमा दर्ता नं. : २००१।०७७–०७८
  • कार्यालय सम्पर्क
  • Lazimpat, Ranibari- Kathmandu - 3
    +977 01 4240666 / 977-014011122
    Admin: [email protected]
    News: [email protected]
    विज्ञापनका लागि सम्पर्क
  • +977 9802082541, 9802060000
    [email protected]
साइट नेभिगेशन
  • गृहपृष्‍ठ
  • समाचार
  • विशेष
  • अन्तर्वार्ता
  • एबीसी विज
  • जीवनशैली
  • मनोरञ्जन
  • विचार
  • SS Opinion
एबीसी मिडिया ग्रुप प्रा.लि.टीम
  • अध्यक्ष / प्रधान सम्पादक : शुभशंकर कँडेल
  • प्रबन्ध निर्देशक : शारदा शर्मा
  • सम्पादक : डण्ड गुरुङ
  • सह-सम्पादक : कविराज बुढाक्षेत्री
©2026 ABC NEWS NEPAL | No.1 News channel of Nepal | Website by Appharu