ABC NEWS NEPAL | No.1 News channel of Nepal
२१ श्रावण २०८३, बिहिबार
  • होमपेज
  • मुख्य समाचार
  • अर्थ वाणिज्य
  • विचार
  • खेलकुद
  • अन्तर्राष्ट्रिय
  • प्रदेश विशेष
  • राजनीति विशेष
  • ENGLISH
  • समाचार
  • विशेष
  • रिपोर्ट
  • विचार
  • अर्थ वाणिज्य
  • जीवनशैली
  • प्रदेश विशेष
  • मनोरञ्जन
  • खेलकुद
  • ENGLISH
  • प्रदेशबिशेष
    • कोशी
    • मधेश
    • बागमती
    • गण्डकी
    • वाग्मती
    • कर्णाली
    • सुदूरपश्चिम
  • सोसल भिडिया
  • Facebook
  • Twitter
  • Youtube
  • Instagram

Akhilesh Yadav Criticizes BJP Over Poor Road Quality and Corruption


ABC NEWS
२१ श्रावण २०८३, बिहिबार   १ : ०५   बजे

Kathmandu— Samajwadi Party chief Akhilesh Yadav has criticized the ruling Bharatiya Janata Party (BJP) government in Uttar Pradesh for poor road construction quality, alleging that newly inaugurated roads are already in need of repairs. In a post on X, he shared a video showing repair work being done with electric fans to dry patched surfaces, questioning whether such infrastructure can be trusted by the public.

Allegations of Substandard Construction

Yadav's criticism extends beyond just one road. He questioned the progress and quality of the proposed 'Atal Progress Way,' suggesting that it might remain confined to planning or exist only on paper. The SP chief alleged that under BJP rule, construction projects are often subpar in quality, with many collapsing or falling apart more frequently than they function properly.

In a broader attack on the ruling party, Yadav accused the government of widespread corruption and poor oversight in infrastructure projects.

NHAI's Response

The National Highway Authority of India (NHAI) has responded to the allegations by stating that stringent action has been taken against the concessionaire, Independent Engineer, and concerned officials following the identification of issues on the Kanpur-Lucknow Expressway. Immediate corrective measures have been initiated to restore the affected stretch and strengthen quality assurance mechanisms.

NHAI reported that a slippage of about 300 meters was observed near km 64 (RHS) of the expressway on July 26, 2026. Prompt restoration works were ordered, along with a comprehensive technical assessment of the affected location and disciplinary actions against stakeholders responsible for deficiencies in project execution and supervision.

Traffic has been diverted at the spot where issues were identified, but is currently plying smoothly. Toll collection on this stretch of the expressway has been suspended until complete rectification.

(With inputs from ANI)

Originally published on abcnews.com.np.

प्रतिक्रिया दिनुहोस्

ताजा अपडेट

राष्ट्रिय भेलाअघि स्वदेश फर्किँदै शेरबहादुर देउवा, साउन २९ अगावै नेपाल आइपुग्ने

मुन्दडाको घरमा ‘हेभी अपरेशन : प्रधानमन्त्री कार्यालय हुँदै गृहमन्त्रालयबाट आएको सूचनाका आधारमा छापा, द्योगीहरूको आपत्ति, एसपीसँग स्पष्टीकरण

सम्बन्धित

Germany Expands Federal Police Powers with AI Surveillance

Germany’s Military Modernization Struggles Amid Procurement Delays

Exiled Bangladesh PM Sheikh Hasina Vows Return Amid Death Sentence

Four Hospitals Approved for Teaching Status at Health Sciences University

China Builds Lab for Mars Sample Return Mission

Congress MP Criticizes Cancellation of ‘Chhatron Ki Goonj’ Program

ABC NEWS NEPAL | No.1 News channel of Nepal
एबीसी मिडिया ग्रुप प्रा.लि.
  • सूचना विभागमा दर्ता नं. : २००१।०७७–०७८
  • कार्यालय सम्पर्क
  • Lazimpat, Ranibari- Kathmandu - 3
    +977 01 4240666 / 977-014011122
    Admin: [email protected]
    News: [email protected]
    विज्ञापनका लागि सम्पर्क
  • +977 9802082541, 9802060000
    [email protected]
साइट नेभिगेशन
  • गृहपृष्‍ठ
  • समाचार
  • विशेष
  • अन्तर्वार्ता
  • एबीसी विज
  • जीवनशैली
  • मनोरञ्जन
  • विचार
  • SS Opinion
एबीसी मिडिया ग्रुप प्रा.लि.टीम
  • अध्यक्ष / प्रधान सम्पादक : शुभशंकर कँडेल
  • प्रबन्ध निर्देशक : शारदा शर्मा
  • सम्पादक : डण्ड गुरुङ
  • सह-सम्पादक : कविराज बुढाक्षेत्री
©2026 ABC NEWS NEPAL | No.1 News channel of Nepal | Website by Appharu