ABC NEWS NEPAL | No.1 News channel of Nepal
१२ भदौ २०८३, शुक्रबार
  • होमपेज
  • मुख्य समाचार
  • अर्थ वाणिज्य
  • विचार
  • खेलकुद
  • अन्तर्राष्ट्रिय
  • प्रदेश विशेष
  • राजनीति विशेष
  • ENGLISH
  • समाचार
  • विशेष
  • रिपोर्ट
  • विचार
  • अर्थ वाणिज्य
  • जीवनशैली
  • प्रदेश विशेष
  • मनोरञ्जन
  • खेलकुद
  • ENGLISH
  • प्रदेशबिशेष
    • कोशी
    • मधेश
    • बागमती
    • गण्डकी
    • वाग्मती
    • कर्णाली
    • सुदूरपश्चिम
  • सोसल भिडिया
  • Facebook
  • Twitter
  • Youtube
  • Instagram

Four Hydropower Workers Rescued From Rasuwagadhi Project


ABC NEWS
१२ भदौ २०८३, शुक्रबार   ४ : ५५   बजे

Kathmandu— Four employees – Bhakta Bahadur Majhi, Bal Bahadur Majhi, Rajan BK and Sunil Majhi – were successfully rescued from inside the Rasuwagadhi Hydropower Project following a challenging operation conducted amidst adverse weather conditions. The rescue was carried out by teams prioritizing the safety of personnel at flood-affected hydropower projects in Nepal’s Nuwakot and Rasuwa districts. Authorities are also preparing for potential rescue efforts at the Trishuli-3 ‘B’ Hydropower Project, while continuing operations at the Upper Trishuli-3 ‘A’ project.

Rescue Operation Details

The Ministry of Energy, Water Resources and Irrigation confirmed that the four employees were brought out safely. A dedicated helicopter equipped with necessary rescue materials was deployed to aid in the operation, particularly focusing on evacuating personnel stranded at various hydropower projects. Rescue teams have been actively mobilized to relocate employees from the Shanti Bazaar area to safer locations as well.

Ongoing Efforts at Other Projects

Preparations are currently underway for a possible rescue operation at the Trishuli-3 ‘B’ Hydropower Project, though adverse weather conditions continue to pose challenges. A specialized team with essential rescue equipment has also been dispatched to the Upper Trishuli-3 ‘A’ Hydropower Project, anticipating potential needs for personnel trapped within tunnels. The Nepal Electricity Authority (NEA) is leading these efforts.

NEA Prioritizes Safety and Communication

The NEA has emphasized that the safety and rescue of workers at flood-affected projects are its top priority. They have mobilized resources to assist employees and workers stranded at multiple hydropower sites, particularly in Nuwakot and Rasuwa districts. The NEA also urged the public to remain calm and rely on information released by official authorities during this difficult time.

Rescue and relief operations will continue as needed, according to the Nepal Electricity Authority.

 

Originally published on abcnews.com.np.

प्रतिक्रिया दिनुहोस्

ताजा अपडेट

४ सय कन्टेनर र एक हजार कामदार सम्पर्कविहीन, केरुङ नाकाको बाढीले व्यवसायीलाई ठूलो धक्का

अन्तर्राष्ट्रिय उद्धार टोलीलाई किन अनुमति दिइएन ?

सम्बन्धित

Sudurpaschim Province Allocates Funds for Bhotekoshi Flood Relief

Bhotekoshi River Flow Increases, But Lake Remains Stable, Chinese Officials Say

Over 200 Nepal Electricity Authority Employees Missing After Bhotekoshi Flood

Nepal Prime Minister and Cabinet Pledge Salaries to Disaster Relief Fund

Australia Offers Support Following Deadly Nepal Floods

Gaza Lifeguards Struggle to Protect Swimmers Amid War’s Devastation

ABC NEWS NEPAL | No.1 News channel of Nepal
एबीसी मिडिया ग्रुप प्रा.लि.
  • सूचना विभागमा दर्ता नं. : २००१।०७७–०७८
  • कार्यालय सम्पर्क
  • Lazimpat, Ranibari- Kathmandu - 3
    +977 01 4240666 / 977-014011122
    Admin: [email protected]
    News: [email protected]
    विज्ञापनका लागि सम्पर्क
  • +977 9802082541, 9802060000
    [email protected]
साइट नेभिगेशन
  • गृहपृष्‍ठ
  • समाचार
  • विशेष
  • अन्तर्वार्ता
  • एबीसी विज
  • जीवनशैली
  • मनोरञ्जन
  • विचार
  • SS Opinion
एबीसी मिडिया ग्रुप प्रा.लि.टीम
  • अध्यक्ष / प्रधान सम्पादक : शुभशंकर कँडेल
  • प्रबन्ध निर्देशक : शारदा शर्मा
  • सम्पादक : डण्ड गुरुङ
  • सह-सम्पादक : कविराज बुढाक्षेत्री
©2026 ABC NEWS NEPAL | No.1 News channel of Nepal | Website by Appharu