ABC NEWS NEPAL | No.1 News channel of Nepal
१९ भदौ २०८३, शुक्रबार
  • होमपेज
  • मुख्य समाचार
  • अर्थ वाणिज्य
  • विचार
  • खेलकुद
  • अन्तर्राष्ट्रिय
  • प्रदेश विशेष
  • राजनीति विशेष
  • ENGLISH
  • समाचार
  • विशेष
  • रिपोर्ट
  • विचार
  • अर्थ वाणिज्य
  • जीवनशैली
  • प्रदेश विशेष
  • मनोरञ्जन
  • खेलकुद
  • ENGLISH
  • प्रदेशबिशेष
    • कोशी
    • मधेश
    • बागमती
    • गण्डकी
    • वाग्मती
    • कर्णाली
    • सुदूरपश्चिम
  • सोसल भिडिया
  • Facebook
  • Twitter
  • Youtube
  • Instagram

Trishuli-3 Hydropower Project Floods: Search and Rescue Efforts Continue Amid Ongoing Recovery


ABC NEWS
१९ भदौ २०८३, शुक्रबार   ११ : ५५   बजे

Kathmandu— Search and rescue operations continue at multiple hydropower sites in Nepal following catastrophic flooding on August 26, with teams recovering two survivors and one body from the Trishuli-3 'A' tunnel while making significant progress at other locations including Trishuli-3 'B' and Langtang hydropower projects.

Rescue Operations at Trishuli-3 'A'

A joint team of 75 Nepali Army personnel, 18 from the Armed Police Force, and Nepal Police successfully rescued two individuals from the Trishuli-3 'A' hydropower tunnel, who are now receiving medical treatment at Birendra Military Hospital in Kathmandu.

The rescue effort also recovered one deceased body during the operation, with the Nepali Army confirming that search teams are still working to locate additional individuals trapped in the affected area.

Progress at Trishuli-3 'B' Site

A separate rescue team comprising 89 soldiers and three civilians has made substantial progress at the Trishuli-3 'B' location, excavating 426 meters into the site to reach trapped individuals.

The operation is being conducted with heavy machinery and specialized equipment to navigate the debris-filled tunnel environment, though the exact number of people still missing remains unclear.

Multiple Sites Under Active Recovery

At the Langtang Hydropower site, a team of 25 army personnel and two civilians entered the tunnel and recovered two bodies, with rescue operations continuing at the location.

Meanwhile, at the Chilime Hydropower Project, teams are using generators and pumps to remove sludge from the affected area, while the Haku tunnel at Upper Trishuli-1 is being cleared with the assistance of rafts and boats to navigate the waterlogged terrain.

Rescue teams continue their efforts across all affected hydropower sites, with operations expected to persist until all trapped individuals are located or confirmed missing.

(With inputs from RN)

Originally published on abcnews.com.np.

प्रतिक्रिया दिनुहोस्

ताजा अपडेट

गृह मन्त्रालयले फेर्‍यो सीडीओको जिम्मेवारी, झापादेखि म्याग्दीसम्म नयाँ नियुक्ति

भोटेकोसी बाढीपीडितका लागि राष्ट्रसंघले ४ करोड ९६ लाख डलर सहयोग जुटाउने

सम्बन्धित

UN Report Concludes Israel’s West Bank Operation Constitutes Ethnic Cleansing

Nepal Continues Search and Rescue Operations Amid Bhotekoshi Flood Crisis

PM Shah Dedicates Janmastami Message to Flood-Affected Children

President Paudel Visits Krishna Temple in Patan for Janmastami Celebrations

US Adds 162,000 Jobs in August, Fueling Fed Rate Hike Expectations

October 7 Attack Dominates Israeli Election Campaign Amid Blame-Shifting

ABC NEWS NEPAL | No.1 News channel of Nepal
एबीसी मिडिया ग्रुप प्रा.लि.
  • सूचना विभागमा दर्ता नं. : २००१।०७७–०७८
  • कार्यालय सम्पर्क
  • Lazimpat, Ranibari- Kathmandu - 3
    +977 01 4240666 / 977-014011122
    Admin: [email protected]
    News: [email protected]
    विज्ञापनका लागि सम्पर्क
  • +977 9802082541, 9802060000
    [email protected]
साइट नेभिगेशन
  • गृहपृष्‍ठ
  • समाचार
  • विशेष
  • अन्तर्वार्ता
  • एबीसी विज
  • जीवनशैली
  • मनोरञ्जन
  • विचार
  • SS Opinion
एबीसी मिडिया ग्रुप प्रा.लि.टीम
  • अध्यक्ष / प्रधान सम्पादक : शुभशंकर कँडेल
  • प्रबन्ध निर्देशक : शारदा शर्मा
  • सम्पादक : डण्ड गुरुङ
  • सह-सम्पादक : कविराज बुढाक्षेत्री
©2026 ABC NEWS NEPAL | No.1 News channel of Nepal | Website by Appharu