ABC NEWS NEPAL | No.1 News channel of Nepal
२१ श्रावण २०८३, बिहिबार
  • होमपेज
  • मुख्य समाचार
  • अर्थ वाणिज्य
  • विचार
  • खेलकुद
  • अन्तर्राष्ट्रिय
  • प्रदेश विशेष
  • राजनीति विशेष
  • ENGLISH
  • समाचार
  • विशेष
  • रिपोर्ट
  • विचार
  • अर्थ वाणिज्य
  • जीवनशैली
  • प्रदेश विशेष
  • मनोरञ्जन
  • खेलकुद
  • ENGLISH
  • प्रदेशबिशेष
    • कोशी
    • मधेश
    • बागमती
    • गण्डकी
    • वाग्मती
    • कर्णाली
    • सुदूरपश्चिम
  • सोसल भिडिया
  • Facebook
  • Twitter
  • Youtube
  • Instagram

Major Highways Disrupted by Monsoon-Induced Floods and Landslides in Nepal


ABC NEWS
२१ श्रावण २०८३, बिहिबार   १० : ५५   बजे

Kathmandu— Several major highways and transportation routes across Nepal have been severely impacted by monsoon-induced floods and landslides, causing significant disruptions to travel. The BP Highway, Kanti Highway, Araniko Highway, Pasang-Lhyamu road, Nagma-Gamgadhi road, and Kaligandaki corridor are among those affected, with some sections closed or restricted during certain hours.

BP Highway Disruptions

The Khurkot-Nepalthok-Katunjebensi section of the BP Highway has been severely impacted by flooding and landslides. According to Nepal Police, this stretch will only be open from 4 am to 6 pm due to safety concerns.

Kanti Highway Closures

The Hetauda-Bhimphedi-Bagmati-Lalitpur road section of the Kanti Highway has been closed during nighttime hours. The Lamosanghu-Ramechhap road in Dolakha district is also obstructed due to flooding, posing significant challenges for travelers.

Araniko Highway Blockages

The Araniko Highway, a crucial route connecting Kathmandu with Tibet, has been blocked at Charkilo and Kodari in Sindhupalchowk district due to landslides. These disruptions have severely impacted travel along this vital corridor.

Alternative Routes Recommended

Nepal Police urge travelers to check the latest road conditions with relevant authorities before setting out during the monsoon season and exercise extra caution while traveling through landslide-prone areas. The public has been advised to use alternative routes until suspended sections are restored.

(With inputs from Rising Nepal)

Originally published on abcnews.com.np.

प्रतिक्रिया दिनुहोस्

ताजा अपडेट

सरकारी कर्मचारीको नयाँ तलबमान लागू, १० प्रतिशत प्रोत्साहन भत्ता र पेन्सन पनि बढ्यो

१५ दिनमा तलब दिने निर्णय कार्यान्वयनमै अलमल

सम्बन्धित

Opposition MPs Protest Over Ram Mandir Donation Theft and Police Action

Jharkhand Students Continue Hunger Strike Over Exam Irregularities

Indian MP Celebrates Meta CEO’s Apology as Victory for National Laws

Ecuador’s President Noboa Tightens Grip Amid Local Elections

FIFA’s Funding Plan Faces Backlash from Global Football Bodies

Republicans Label Democrats as Socialists in Election Strategy

ABC NEWS NEPAL | No.1 News channel of Nepal
एबीसी मिडिया ग्रुप प्रा.लि.
  • सूचना विभागमा दर्ता नं. : २००१।०७७–०७८
  • कार्यालय सम्पर्क
  • Lazimpat, Ranibari- Kathmandu - 3
    +977 01 4240666 / 977-014011122
    Admin: [email protected]
    News: [email protected]
    विज्ञापनका लागि सम्पर्क
  • +977 9802082541, 9802060000
    [email protected]
साइट नेभिगेशन
  • गृहपृष्‍ठ
  • समाचार
  • विशेष
  • अन्तर्वार्ता
  • एबीसी विज
  • जीवनशैली
  • मनोरञ्जन
  • विचार
  • SS Opinion
एबीसी मिडिया ग्रुप प्रा.लि.टीम
  • अध्यक्ष / प्रधान सम्पादक : शुभशंकर कँडेल
  • प्रबन्ध निर्देशक : शारदा शर्मा
  • सम्पादक : डण्ड गुरुङ
  • सह-सम्पादक : कविराज बुढाक्षेत्री
©2026 ABC NEWS NEPAL | No.1 News channel of Nepal | Website by Appharu